Kwik-Klik has installed a 60 linear metre trackside hoarding at Reading Station, opposite Platform 4.
The project uses 500mm wide x 3 metre high Ultraspan panels which are manufactured to Network Rail's R-11 specifications, creating a hoarding that is in Network Rail's distinctive corporate colours.
Working with the main contractors Costain Hochtief, it was decided that a raised timber frame was the most practical and cost-effective solution.The panels used are made from 100% recycled PVC and at the end of their life, these panels are also 100% recyclable.
The Reading Station upgrade programme will take 9 months and is part of the nationwide Network Rail improvement programme.