RAF Lossiemouth, Scotland // Case Study

30 Aug 2010

An extensive hoarding at the RAF's largest fast jet base.

Kwik-Klik supplied a 410 linear metre perimeter hoarding for a 2-year build programme at the RAF's largest fast jet base.

Robust 2.5 metre high Ultraspan panels will withstand the substantial coastal winds experienced on the site in the north of Scotland.

Kwik-Klik undertook wind tests prior to delivery to the contractor, Hewlett and Debut, a specialist division of Bovis Lendlease. Their team installed the hoarding to Kwik-Klik's fixing specifications.

The steel supports behind the hoardings slide into plastic sleeves within concrete footings to provide extra strength and to allow quick dismantling at the end of the project.