Secure external hoardings in cathedral grounds

A robust 250 linear metre perimeter hoarding was installed in the grounds of Hereford Cathedral to enable a major re-development to begin.

The main contractor was CJ Bayliss and blue Ultraspan panels were used to create a secure site perimeter. To minimise damage to the grounds, the supporting frame sat on top of the ground and sandbags were used to add stability and remove the need for digging or disturbing the ground.

Kwik-Klik hoarding systems were also used at ground level around the area immediately beneath the Cathedral tower which has undergone a restoration programme.

Our systems used in this project

Contact us about your project

Please don’t hesitate to get in touch about your project, to find out how Kwik-Klik’s expert team and flexible systems can help.

Get in touch now
Similar case studies

Kwik-Klik and Hygienik Systems are trading companies within the Hygienik Holdings group. Ecogenik is the sustainability division of Kwik-Klik.

  • Kwik-Klik
  • Hygienik Systems
  • Ecogenik