Bullring 2, French Connection // Case Study

10 Mar 2014

Bespoke 9m corner hoarding for fcuk

Kwik-Klik returned to Birmingham's Bullring Centre to install a substantial 9 metre high temporary hoarding which will allow the French Connection (fcuk) store to undergo a re-fit.

Soundmaster panels were used to create the hoarding on a prime corner within the shopping centre.

The photographs show how the temporary fire-rated hoarding maintains business as usual within the shopping centre while allowing trades people access to the storefront in the 1 metre void behind the hoarding.

Click on the magnifying glass symbol to enlarge the photographs and see the hoarding in more detail.

Refurbishment work will convert the store into two retail units. Further photographs showing vinyl graphics on the hoarding will be posted here shortly.

Contact us about your project

Please don’t hesitate to get in touch about your project, to find out how Kwik-Klik’s expert team and flexible systems can help.

Get in touch now
Similar case studies