Asda Living, Leeds // Case Study

12 Feb 2008

Hoardings on two floors in a busy store environment

Kwik-Klik installed 2.4 metre a 2.4 metre Complete modular hoarding system to screen refurbishment work in the flagship Asda Living Store at Crown Point Retail Park in Leeds.

Working alongside Withey Contractors, we established large work area on the mezzanine level and a smaller area on the ground floor which prevented customer access to the escalators.

The Complete system presents a clean, white backdrop for fashion graphics and Asda notices about the in-store refurbishment. The hoardings created a professional backdrop for the Valentine point of sale materials which can be seen in the photographs.

Downloads

Please click on the files names below to download PDF documents.

Contact us about your project

Please don’t hesitate to get in touch about your project, to find out how Kwik-Klik’s expert team and flexible systems can help.

Get in touch now
Similar case studies

Kwik-Klik and Hygienik Systems are trading companies within the Hygienik Holdings group. Ecogenik is the sustainability division of Kwik-Klik.

  • Kwik-Klik
  • Hygienik Systems
  • Ecogenik